Most viewed |

Cavendysh windvane on Lake Erie1286 views
|
|

Bolt thru core - west system1283 viewsremove core - fill with expoxy - drill mounting hole
|
|

1282 views
|
|

Placement of winches on the mast 1281 views
|
|

331 wiring proj 061278 views
|
|

1276 viewsprep and primer
|
|

Bukh water inlet1276 viewsWater inlet for the Bukh engine in my 1984 Contessa 26 (hull #322)
|
|

V-Berth Lockers 81275 viewsThe centre panels fold flat, can be stood upon, and are notched to match the V-berth cut-out.
|
|

under mast beam1274 viewsthis was put in to support the deck under the mast, see how the beam was notched into the upright of the bulkhead
|
|

cavendysh traveller june 20071272 views
|
|

Over Draft II1267 viewsOver Draft II being readied for winter.
|
|

Cockpit drain valves1267 viewsCockpit drain valves, need to be modified for quick closing
|
|
520 files on 44 page(s) |
 |
 |
 |
 |
 |
23 |  |
 |
 |
 |
|